I've finished up on a two year project with a client. As is my way I've started to rebuild my development environment so that it is as clean and pristine as possible for my next assignment. While I've always remembered reinstalling all of my development tools to be a day long process I've noticed that this time around the number of installations I had to do has grown significantly.
- Windows 7 Ultimate Edition (RC)
- IIS 7
- Visual Studio 2008
- Visual Studio 2008 SP 1
- Visual Studio Cloud Services
- Windows Azure SDK (64-bit Edition)
- .Net Services SDK
- Mesh Client
- Expressions 2
- Blend 2
- Blend 3 RC
- Web 2
- Encoder 2
- Designer 2
- Media 2
- Deep Zoom Composer
- Silverlight 2 Tools
- Silverlight 3 Tools
- SQL Server 2008
- SQL Server 2008 SP1
- Windows Mobile 6 Professional Refresh
- Windows Mobile 6 Standard Refresh
- Windows Mobile 6.5 Professional DTK
- Windows Mobile 6.5 Standard DTK
- Windows Mobile 6 Professional Images
- Windows Mobile 6 Standard Images
- Windows Mobile 6.1.4 Professional Images
- Windows Mobile 6.1.4 Standard Images
- Samsung Windows Mobile SDK
- .Net CF v3.5 Power Toys
- Office 2007
- Office Communicator
- MSN Messenger
- XNA Game Studio Express 3.0 - (for recreational programming)
- VMWare
- Virtual PC
I really need to find a better (fully automated) way to handle this.
Updated - With Windows Mobile 7 RTM coming soon I'm keeping this list up to date for my own good
I need to add the following:
- Expressions Blend 3
- Composite Application Guidance - Feb 2008
- Project Linker
Tags: